NEWS DETAIL
You are here: Home » News » Industry News » How to maintain stage lighting equipment

How to maintain stage lighting equipment

Views: 28     Author: VanGaa     Publish Time: 2022-06-28      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

The life of lighting equipment is largely determined by the quality of maintenance. The maintenance of lighting equipment is relatively trivial, basically daily routine inspection, weekly regular inspection, monthly equipment maintenance and proper debugging. VanGaa Lighting also has many customers who are doing quite well in this regard. Today, let's talk about the precautions for equipment maintenance and the scope of routine testing.


     One: Precautions


     1: Half an hour before the opening, turn on all the devices - perform low temperature preheating, and test all equipment and lines at the same time. The low temperature state means that the lights are slightly bright.


     2: After 15 minutes of preheating, reset all equipment to zero, let the equipment dissipate heat, and the cooling time should not be less than 15 minutes.


     3: After cooling, you can officially enter the stage of music performance.


     4: After the performance is over and the guests leave the venue, the lighting engineer should turn off all equipment and let the equipment cool for 15 to 20 minutes, and then seal or mask the equipment before the lighting engineer can leave the venue.


     Two: the scope of routine detection


     1: Whether the bulb can be lit normally.


     2: Whether all devices are connected properly.


     3: Whether all equipment can be used normally, including whether the light control switch, color changer control, computer light action, etc. are normal.


     4: Whether the DMX512 signal can control the lamps normally.


     5: Whether the special effects equipment is in normal use and filled with required materials: for example: hood, fog machine, snow machine, bubble machine, etc.

摇头灯主图3


Recent News
Common Problem

  • How do you make our business long-term and good relationship?

    1. We keep good quality and competitive price to ensure our customers benefit ;
    2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
  • What is the shipping method?

    It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.
  • What is your payment term?

    T/T,Western Union,MoneyGram.This is negotiable.
  • What is your lead time?

    It depends on the order quantity and the season you place the order.
    Usually we can ship within 7-15 days for small quantity,and about 30 days for large quantity.
  • Can I buy samples placing orders?

    Yes.Please feel free to contact us.
  • How can i get the price?

    We usually quote within 24 hours after we get your inquiry(Except weekend and holidays). If you are very urgent to get the price,
    please email us or contact us in other ways so that we can offer you a quote.
Recommended Products

Contact

Address: Floor 8, Building 2, Dingshengzhigu Industry Park, No. 9, Dabu Road, Xinhua Town, Huadu District, 510800 GZ, P. R. China
Phones: +86-13825128583   +86-20-86432439 ext 801
Email: info@vangaa.com

tawk

About Us
Copyright © 2009-2025 Guangzhou Weijia Photoelectric Tech., Co., Ltd
All Rights Reserved  Technology by leadong 

DISCOVER MORE