NEWS DETAIL
You are here: Home » News » Industry News » What problems should be paid attention to during the installation and use of LED par lights?

What problems should be paid attention to during the installation and use of LED par lights?

Views: 0     Author: Site Editor     Publish Time: 2021-06-18      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

If the LED par light is installed and used improperly, it will easily cause the bulb to burn out. The Vangaa lighting stage lighting manufacturer introduces several factors that cause the LED par light bulb to burn out. You can take a lesson and pay more attention to the operation.


The first is that the installation operator mistakenly connects the signal line and the power line, which will cause a string of signal lights to burn out after the power is turned on.


Second, when it rains, if no waterproof measures are taken, water in the signal head will burn out the signal of a string of lights.


The third type, the use of poor quality or non-optical isolation technology signal amplifier leakage, so that the lamp signal enters the strong current, the bulb will burn out.


Fourth, if the system installation environment is bad and the power line and signal line are not well isolated, it will also cause interference with the signal, which will randomly cause the lamp to fail to operate normally.

LED par lights

LED Par Light


For more details about the installation and use of LED par lights, please consult us, Vangaa lighting has 14 years of experience in the stage industry and technology precipitation. Provide light bitmaps, system diagrams, effect diagrams, lighting configuration; free technical guidance, appointment installation, debugging, training qualifications are complete, four systems, CE, ROHS, and test reports. We uphold the behavioral philosophy of continuous improvement, attitude, and teamwork, and respect every penny and trust of our customers.


The company's main product series: LED spotlight series, LED flat soft light series, LED conference light series, LED imaging light series, LED par light series, moving head beam light series, and related supporting products.


Products and services have been tested and approved by Sinopec, China Mobile, China Unicom, China Post, Communication University of Beijing, Shantou University, Shaoguan University, dozens of public security systems, TV studios, and art theaters. Consultation hotline +86 159 4961 0761


Recent News
Common Problem

  • How do you make our business long-term and good relationship?

    1. We keep good quality and competitive price to ensure our customers benefit ;
    2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
  • What is the shipping method?

    It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.
  • What is your payment term?

    T/T,Western Union,MoneyGram.This is negotiable.
  • What is your lead time?

    It depends on the order quantity and the season you place the order.
    Usually we can ship within 7-15 days for small quantity,and about 30 days for large quantity.
  • Can I buy samples placing orders?

    Yes.Please feel free to contact us.
  • How can i get the price?

    We usually quote within 24 hours after we get your inquiry(Except weekend and holidays). If you are very urgent to get the price,
    please email us or contact us in other ways so that we can offer you a quote.
Recommended Products

Contact

Address: Floor 8, Building 2, Dingshengzhigu Industry Park, No. 9, Dabu Road, Xinhua Town, Huadu District, 510800 GZ, P. R. China
Phones: +86-13825128583   +86-20-86432439 ext 801
Email: info@vangaa.com

tawk

About Us
Copyright © 2009-2025 Guangzhou Weijia Photoelectric Tech., Co., Ltd
All Rights Reserved  Technology by leadong 

DISCOVER MORE