General Regulations for the Construction of TV Station Studio System Engineering

Publish Time: 2021-05-10     Origin: Site

General Regulations for the Construction of TV Station Studio System Engineering


The construction unit shall submit the construction organization, construction plan, and relevant qualification certificates to the construction unit and the supervision unit before entering the site, and construction can only be carried out after approval. In order to meet the lighting system installation and implementation, the site should have the corresponding basic conditions before the construction, the relevant buildings and technical auxiliary facilities should be installed according to the approved design documents, meet the national and industry specifications, meet the design standards, and be able to use normally. The construction site should meet the following condition:


1 The construction site complies with the relevant regulations of the current fire safety standards;


2 Confirm the load requirements of the lighting equipment layer and the ground structure;


3 The interior decoration, lighting control room, dimmer room walls, floors, doors and windows of the studio have been completed;


4 The embedded parts and reserved holes of the lighting equipment have been completed and meet the design requirements;


5 The power supply and cables of the lighting system are in place;


6 The ventilation ducts, work lighting, and fire-fighting ducts of the studio have been installed, and the ceiling steel frame has been sprayed for fire protection;


7 The pedestrian aisles, handrails, and stairs on the lighting equipment floor are complete and firm;


8. The roof and floor slab construction is completed without leakage.

TV station studio system engineering construction


The safety technical measures during the construction shall comply with this code, the current national safety technical standards, and the provisions of the product technical documents. For important processes, the construction unit shall formulate safety technical measures in advance.


The main construction personnel should have a detailed understanding of the structure, performance, and technical requirements of the installed lighting system equipment.


The construction personnel should fully prepare all the auxiliary materials and tools needed in the construction of the project.


The various measuring and testing instruments, instruments, meters and equipment used in the equipment installation shall comply with the current national measurement regulations, and their accuracy level shall not be lower than the accuracy level of the tested object.


After the lighting equipment and equipment arrive at the site, the construction unit should check the lighting system equipment together with the supervision unit and the construction unit, and the equipment should meet the following requirements:


1 The equipment technical documents are complete, and the equipment and equipment provide factory certificate, product manual, test report, etc.;


2 Packaging and marking comply with relevant national standards;


3 The models and specifications of equipment and materials meet the design requirements;


4The equipment is intact, and the accessories and spare parts are complete.


The lighting system should be constructed in accordance with the approved design documents. When the design needs to be modified, the construction unit, the supervision unit, and the design unit should agree before proceeding.


The concealed project in the equipment installation shall be inspected by the supervision unit together with the construction unit and the construction unit, and records shall be made, and the system equipment can be installed only after being qualified.


During construction and installation, the construction unit shall conduct self-inspection, mutual inspection and inspection, and inspect and record each process to provide a basis for project acceptance.


Except for special requirements, the used components, installation parts, fasteners, etc. should be treated with corrosion and rust prevention.


After the lighting system equipment is installed, the dirt should be removed, the site should be cleaned, and the construction unit, supervision unit, and other construction units should fill in the holes and repair the damaged parts of the building.


After the lighting system equipment is installed and debugged, after the trial operation, the construction unit organizes the supervision unit, the design unit and the construction unit to pass the acceptance before it can be put into formal operation.


Inquiry

2025 Product Catalog of VanGaa Professional

Vangaa Shines at 2025 Guangzhou GET Show with Professional Film & TV Lighting Solutions

2024 Product Catalog of VanGaa Professional

Discover VanGaa's Lighting Innovations at 2025 GETSHOW

Vangaa at the LDI Exhibition in Las Vegas, USA, Illuminating a New Vision of Light and Shadow Art